Skip to Content

Xavier High School’s Saints Field Renovation Begins

Xavier High School broke ground on May 6 and are well on their way to modernizing the Saints Field.

< Back to All Insights

2181290_700x500.jpg

Xavier High School broke ground on May 6 and are well on their way to modernizing the Saints Field. The natural grass surface will be replaced with field turf. These renovations will help the school located in Cedar Rapids, Iowa save almost $40,000 a year in maintenance costs (e.g. irrigating, mowing, aerating, rolling, fertilizing, weed control and striping).

See CBS2/FOX28 article for more information.